Brewton, ALMiles of 2”, 6”, & 8” Install

Boardwalk

LocationBoardwalk Completed Projects
Vicksburg, MS – Butler, AL ROW Remediation 200 Miles

denbury

LocationDenbury Completed Projects
Biddle, MOBell Creek Installation – 30 Miles of 3”
Delhi, LATest Site 3 Flow line Installations – 26 Miles of multiple diameter
Summit, MS3000 ft , 3 in
Tinsley, MS4 and 8 in, 32 miles
Brandon, MS10” Meter Tube fabrication/ Installation
Jackson, MSMultiple ROW Remediation/Bank Stabilization Projects (Submar)
Tinsley, MS Clean, Dry, & Commission 80 Miles 24”
Winnie, TX Install seven (7) 24” MLV’s & four (4) 24” Side Taps
Tallulah, LA Install (4) 24” MLV’s
White Castle, LA/Port Barre, LAFabricate & Install three (3) 30” Launching/Receiving Traps
Baton Rouge, LA Clean, Dry, & Commission 266 Miles of 24”
Tinsley, MS20 Miles of 4” & 8” (Liner Line)

el-paso

LocationEl Paso Completed Projects
Birmingham, AL2 Miles 22” Take-Up & Relay
Ellerslie, GATake-Up & Relay 1,500’ of 20”
Chalmette, LAOff-Set ten (10) p/l’s for installation of Corps of Engineers piling along MS River levee system – 26”, 30”, & 24” – all concrete coated

energy-transfer

LocationEnergy Transfer Completed Projects
Midland, TX Multiple Meter Station Projects – Jameson, Baden, & Midland Stations
Midkiff, TX Lone Star / Atlas Midkiff Pipeline – 17 Miles of 6” and associated facility work
Wink, TX and NM24” Conversion Project – 60 Miles of 24” pipeline conversion including launcher/receivers, main line valves, spike and hydro-test

florida-gas

LocationFlorida Gas Completed Projects
Tampa, FL Anclote Meter and Regulator Station – 20” fabrication consisting of over 6,000 inches of welding
Tallahassee, FL Leon County Project – 3100’ of 24 with road bore installation
Jacksonville, FL Jacksonville Lateral – 1,000’ of 16” with double stopple bypass and MLV fabrication and installation along with sheet piling installation
Jupiter, FL Jupiter Lateral Replacement – 2,200’ replacement consisting of two (2) directional drills
Milton, FL11-2 MLV Replacement – fabrication and installation of four (4) 24” MLV’s and the fabrication and installation of one (1) 30” Launcher
Citronelle, ALErosion Control Phase II
Jacksonville, FL Emergency Anomaly Digs
West Palm Beach, FLCoconut Creek 3 in Replacement
Manatee, FL 1,500’ 6” HDD
Jacksonville, FL16” Emergency Anomaly Dig (3)

genesis

LocationGenesis Energy Completed Projects
Baton Rouge, LA4 Miles of 3” Installation

gulf-south

LocationGulf South Completed Projects
Whitfield, MS – KCS(RR) Casing ExtensionRequired multiple Sheet Pile Boxes

kinder-morgan

LocationKinder Morgan Completed Projects
Birmingham, ALNMLL Project – 22” take up and relay 2,500’

marathon

LocationMarathon Pipeline Completed Projects
Minot, NDLincoln Hopkins Pipeline System – 10 Miles of multiple diameter – Minot, ND – Mountain Terrain
Killdeer, ND Chimney Butte Project – Central Tank Battery & Pipeline – 8 Miles of 4” Pipeline in conjunction with 8 Miles of 3” Flex steel Pipe – Winter Construction
Killdeer, NDMultiple Diameters – 10 miles
Killdeer, ND4 in Gathering Alliance
Dickenson, ND 8 Miles of 4” & 3”

panhandle

LocationPanhandle Energy Completed Projects
Panhandle of FLMultiple PHMSA projects (Hydrotest, Coating, Internal Inspection, etc.)

powersouth

LocationPower South Completed Projects
Orange Beach, AL6,300’ 36” HDD Turnkey Project

south-alabama

LocationSouth Alabama Gas Completed Projects
Repton, AL4 Miles of 4” Installation

southern-natural

LocationSouthern Natural Gas Completed Projects
Pell City, AL Take-Up & Relay 1,000’ of 20”
Columbus, GA1 Mile of 20” Take-up & Relay

tennessee-gas

LocationTennessee Gas Pipeline Completed Projects
Glasgow, KY Casing Extension
Jasper, TX 50 Miles of 30” Spike Test
Louisville, MS Spike Test (Confirmation) 30 miles of 24” – Including one (1) 24” hot tap, & one (1) 24” MLV fabrication/installation
Glasgow, KY30” & 24” Casing Extensions (4)

tesoro

LocationTesoro Completed Projects
Killdeer, NDKilldeer Interconnect – 4 Miles of 6” steel pipeline – agricultural lay
Killdeer, NDCharleston Lact Rehab
Killdeer, ND Ramburg ROW Rehab
Killdeer, NDDunn Center Pump Station – Removal and Installation of two (2) 7,000hp pump units with building and associated piping – Limited work area
Killdeer, NDStation Construction (Launcher/Receiver)